Butler Dance Education Center Blog
November 03, 2006
Take a look at the photo from today and you’ll see that major progress has been made.
This week, the crew poured back concrete for all of the grade beams and finish floor and some of the plumbing.
The white blocks you see are forms for insulated concrete form walls. This first batch goes to six feet high and as of Monday noon or so, they will start pouring the exterior walls to that level. Then they stack another six foot set on top of those and keep on going.
Things are shaping up!

And check out our new sign out front!

|